Operator-run mining facility · Hosted colocation

Bitcoin ASIC colocation without the long back-and-forth on pricing.

Predictable industrial hosting for miners. Published rate-card pricing, real capacity, and an operations team that runs the same hardware you do.

From $0.060/kWh all-in hosting · power, racking, ops
800
Available slots
3.25kW
Standard slot capacity
$0.060/kWh
All-in hosting, from
Operator-run
Built by miners, for miners
Rate card

Capacity that scales with your fleet.

Three lanes — sized for the way most operators actually grow. Final pricing depends on machine model, slot count, term, and service level.

Starter Rack
1 – 24 ASICs
From $0.065 /kWh

Best for testing site fit, validating a machine model, or running a smaller fleet without a long contract.

  • All-in hosted rate from $0.065/kWh
  • Standard slot at 3.25 kW continuous load
  • Single point-of-contact onboarding
  • Month-to-month or short term available
Request starter slots
Fleet Allocation
100+ ASICs
Custom terms Talk to us  

Reserved capacity for institutional and professional operators. Custom term length, deployment schedule, and service level.

  • Custom term length and deployment schedule
  • Priority capacity planning across the build-out
  • Service-level coverage matched to fleet criticality
  • Direct line to operations and deployment leads
Plan fleet allocation

Final pricing depends on machine model, slot count, term length, and service level. Rate card is a starting point, not a quote.

What's included

Hosted infrastructure, not a co-working closet.

A standard slot lands you on a facility that runs continuous industrial mining load every day. Here's what comes with hosting.

  • Power delivery

    Industrial three-phase power to each rack, sized for continuous ASIC load at 3.25 kW per standard slot.

  • Racking & slot allocation

    Assigned slot positions, cable management, and labeled machine placement so your fleet stays trackable.

  • Ventilation & airflow

    Active airflow management tuned for ASIC heat profiles — hot/cold separation across the floor.

  • Basic remote hands

    On-site team handles routine swaps, power cycles, and physical checks. Scoped per service level.

  • Uptime monitoring

    Continuous monitoring with regular check-ins and proactive notifications when a machine drops.

  • Deployment coordination

    Receive, stage, and deploy your shipment on a scheduled lane — no guessing when machines come online.

  • Pool / firmware coordination

    By request, we'll point machines at your pool, apply approved firmware, and document the configuration.

Onboarding

From inquiry to hashing in four steps.

  1. 01

    Reserve slots

    Tell us fleet size, target start window, and term preference. We confirm available capacity and reserve your slot count.

  2. 02

    Confirm machines

    We verify ASIC models, expected power draw, firmware, and pool configuration so your slots are provisioned correctly.

  3. 03

    Schedule delivery

    Coordinate freight, receiving window, and on-site staging. You get a deployment date, not a vague queue position.

  4. 04

    Deploy & monitor

    Machines are racked, powered, and pointed. Uptime monitoring starts the moment they're hashing.

Buyer FAQ

Straight answers, no spin.

Is power included in the kWh rate?

Yes. The $0.060/kWh starting rate is all-in hosting — power consumed by your machines, racking, ventilation, and the operations team that runs the floor. There is no separate power bill on top.

What machines fit a standard slot?

Standard slots are sized for continuous industrial ASIC load at approximately 3.25 kW per machine — which covers the majority of modern Bitcoin ASICs in production today. Higher-draw or hydro/immersion units are reviewed case-by-case. Send us your model list and we'll confirm fit.

How fast can I deploy?

Deployment timing depends on slot availability, fleet size, and how quickly your machines land at the facility. Smaller fleets typically deploy within days of receiving freight; larger fleets are scheduled on a deployment lane so you know the date in advance.

Are there volume terms?

Yes — Growth Block (25–99 ASICs) and Fleet Allocation (100+ ASICs) get reviewed against fleet size, term length, and service level. Volume terms aren't published because they depend on the specifics of your deal; that's what the inquiry form is for.

What's not included?

Freight to the facility, the ASICs themselves, mining-pool fees, and any custom firmware licensing are on the customer. Service levels like extended remote hands, custom monitoring, and priority response are scoped per deal. Uptime, curtailment policy, and service expectations are documented in your hosting agreement — not implied here.

Request slots

Tell us what you're deploying.

A few details and we'll come back with availability, fit, and pricing. No drip campaign — just a real reply.

Submitting opens your email client pre-filled to [email protected]. We don't store form data.